|
|
| Brand Name: | Ohory |
| Model Number: | SK-LINE-TT |
| MOQ: | 1 Meter |
| Price: | USD 80-90 per Meter |
| Packaging Details: | Wooden case with moisture barrier film and shock-proof packing |
| Payment Terms: | T/T, L/C |
Ohory SK-LINE-TT Plug-In Track Busway Copper Power Distribution System Remote Voltage Temperature Current Monitoring
In short: The Ohory SK-LINE-TT Plug-In Track Busway Copper Power Distribution System Remote Voltage Temperature Current Monitoring from Ohory is intended for white space row distribution and offers factory tested construction.
Quick Facts
| Item | Detail |
|---|---|
| Standards | IEC 61439-6 |
| Certification | ISO 9001 / IEC 61439-6 / CNAS / CMA |
Key Features
Technical Specifications
| Parameter | Specification |
|---|---|
| Standards | IEC 61439-6 |
| Certification | ISO 9001 / IEC 61439-6 / CNAS / CMA |
| Monitoring | Remote voltage / current / temperature monitoring |
| Tap-Off Type | Plug-in tap-off units |
Typical Applications
Frequently Asked Questions
Q: Which standards does it meet?
A: Manufacturing and testing follow IEC 61439-6.
Q: Which certificates are available?
A: Certification includes ISO 9001 / IEC 61439-6 / CNAS / CMA, with documents supplied at shipment.
Q: What information is needed for a quotation?
A: A single line diagram, route drawing and load schedule are enough for us to quote.
Ordering Notes
Share the project drawing with current rating and ambient conditions and we will return a section schedule with accessories.
|
| Brand Name: | Ohory |
| Model Number: | SK-LINE-TT |
| MOQ: | 1 Meter |
| Price: | USD 80-90 per Meter |
| Packaging Details: | Wooden case with moisture barrier film and shock-proof packing |
| Payment Terms: | T/T, L/C |
Ohory SK-LINE-TT Plug-In Track Busway Copper Power Distribution System Remote Voltage Temperature Current Monitoring
In short: The Ohory SK-LINE-TT Plug-In Track Busway Copper Power Distribution System Remote Voltage Temperature Current Monitoring from Ohory is intended for white space row distribution and offers factory tested construction.
Quick Facts
| Item | Detail |
|---|---|
| Standards | IEC 61439-6 |
| Certification | ISO 9001 / IEC 61439-6 / CNAS / CMA |
Key Features
Technical Specifications
| Parameter | Specification |
|---|---|
| Standards | IEC 61439-6 |
| Certification | ISO 9001 / IEC 61439-6 / CNAS / CMA |
| Monitoring | Remote voltage / current / temperature monitoring |
| Tap-Off Type | Plug-in tap-off units |
Typical Applications
Frequently Asked Questions
Q: Which standards does it meet?
A: Manufacturing and testing follow IEC 61439-6.
Q: Which certificates are available?
A: Certification includes ISO 9001 / IEC 61439-6 / CNAS / CMA, with documents supplied at shipment.
Q: What information is needed for a quotation?
A: A single line diagram, route drawing and load schedule are enough for us to quote.
Ordering Notes
Share the project drawing with current rating and ambient conditions and we will return a section schedule with accessories.